91ÊÓÆµÍøÕ¾ÎÛ

Published

A Waste of Time

Here are five productivity killers to look for the next time you walk through your manufacturing shop.

Share

Leaders-In background

Any time I am invited to tour a manufacturing facility, I go on high alert. I look for areas of the shop’s operation that could use some help, and I can usually spot a few. Surprisingly, I often find that many different companies seem to be hampered by some of the same issues related to wasted productivity.

Here are five common productivity killers you should look for the next time you walk through your shop:

1. People squaring vises and other workholding devices. Although any workholding device used on a machining center must be squared with the machine’s table, there are ways to keep a setup person from having to tediously perform this task every time a device is mounted on the table. Look into pinning or keying devices right to the table, or consider using a subplate to which workholding devices can be mounted repeatedly and accurately. In similar fashion, if a qualified workholding device is repeatedly removed and replaced, be sure to include program zero assignment values (fixture offsets) in G10 commands.

2. Turning center spindles repeatedly accelerating and decelerating. When you walk by a turning center, stop and listen for a cycle or two. Do you hear the spindle slowing down as the turret retracts for a tool change? Does it speed up again when the next tool approaches?

Such repeated acceleration and deceleration of the spindle at turret indexes should be taken as a signal that constant surface speed is not being efficiently programmed. The programmer is leaving the machine in constant surface speed mode (G96) during turret indexes. This results in wasted time, because it usually takes longer for the spindle to change speeds than it does 
to rapid to or from the turret index position. It also results in wasted electricity, because 
electricity is expended even during spindle slowdowns, as well as undue wear and tear on the spindle drive system.

Have your programmer change the program so that during each tool’s retraction to the toolchange position, the machine switches to rpm mode (G97) and the speed needed at the next tool’s approach position is programmed. 

3. Idle machines. How many CNC machines to do you see sitting idle when you walk through your shop?  While some idleness—possibly during setup—may be acceptable, specifically look for times when there’s no one around. In many shops I visit, setup people and operators are kept so busy that they cannot keep up with the machines they run. In extreme cases, half the machines regularly sit idle. (In these cases, I often wonder if the company could actually get by with just half the machines it owns.)

At the very least, determine the reasons why machines are sitting idle and question the acceptability of having them do so. Consider focusing more on machine utilization than personnel utilization.

4. People working hard but not necessarily working smart. Here’s an example of this that I came across during a lengthy production run: The cycle ends. The operator opens the door and removes the completed workpiece. He brings it to the bench, cleans it, deburs it, measures it, reports the measured finding to the SPC system and makes a sizing adjustment. He then picks up the next piece of raw material. It’s grimy. He cleans it and removes a burr that will affect workpiece loading. He then places it in the workholding device, closes the door, and starts the next cycle. 

What’s wrong with this picture? There are many things, of course, that the operator could be doing while the machine is in-cycle in order to get ready for the next cycle and to minimize the number of things that must be done while the machine is down between cycles. I’ve heard this referred to as staging. Figure out what can be staged for upcoming work, and be sure operators know as well. Similarly, figure out what the operator (or someone else) could be doing to get ready for an upcoming job. 

5. People are not where they are supposed to be. As you walk the shop, look for people who are not where they belong, meaning they are not operating the machines they are supposed to be operating. It’s likely that they’ve had to walk away from their machines in order to get something—a hand tool, a gage, an insert. While certain items obviously will have to be gathered before a setup can be made or a production run completed, be sure that shop workers are consolidating their trips to minimize the number of times they must leave a machine. Your goal should be to keep setup people at their machines for the entire setup and operators for the entire production run. If all items needed to complete a setup or production run can be gathered once (and before the job comes up) you can eliminate a lot of downtime in your shop.

Identifying wasted productivity can be as easy as taking a stroll through the manufacturing facility and observing what the people and machines in it are doing—or not doing. If you look for common productivity killers such as those described here, you can come up with solutions for eliminating the waste.

Related Content

CNC Tech Talks

6 Ways to Streamline the Setup Process

The primary goal of a setup reduction program must be to keep setup people working at the machine during the entire setup process.

Read More
CNC Tech Talks

4 Reasons to Use Safety Commands

Safety commands help safeguard CNC applications from common programming or operation errors.

Read More
CNC Tech Talks

5 Reasons Why You Should Know How to Write Custom Macros

Custom macros enhance what can be done in G-code programs, giving users the ability to code operations that were previously not possible.

Read More
CNC Tech Talks

6 Variations That Kill Productivity

The act of qualifying CNC programs is largely related to eliminating variations, which can be a daunting task when you consider how many things can change from one time a job is run to the next.

Read More

Read Next

Top Shops

Machine Shop MBA

  Making Chips and 91ÊÓÆµÍøÕ¾ÎÛ are teaming up for a new podcast series called Machine Shop MBA—designed to help manufacturers measure their success against the industry’s best. Through the lens of the Top Shops benchmarking program, the series explores the KPIs that set high-performing shops apart, from machine utilization and first-pass yield to employee engagement and revenue per employee.  

Read More
Automation

AMRs Are Moving Into Manufacturing: 4 Considerations for Implementation

AMRs can provide a flexible, easy-to-use automation platform so long as manufacturers choose a suitable task and prepare their facilities.

Read More